5- Manufacturing, installation and trial of prototype 2

The prototype 2 was built by Tlab srl and calibrated with inert materials before being installed in Area 51, at Vico s.r.l. Following the authorization to experiments by the Regione Liguria, the experimental phase inside Area 51 started.