Expected results

  • Short term results

    As main expected result, prototype 1 would yield the needed technical elements to upscale a performing prototype 2.

    The prototype 2 is made of 4 main parts, largely authomatised compared with prototype 1.

  • Mid term results

    Indications for addressing updated normative protocols of waste treatment at national and cross-national scale. Indications about the industrial quality of combustion products and field of re-use.

     

    Dissemination activity and networking with other LIFE projects beneficiaries, stakeholders, possible future industrial partners is carried out. The timing of the dissemination activity is tightly intersected with the technical development.

  • Long term results

    As a long term feedback, decrease in landfilled waste is expected, and therefore a decreased need for waste dump and a better use of the territory.