Expected results
-
Short term results
As main expected result, prototype 1 would yield the needed technical elements to upscale a performing prototype 2.
The prototype 2 is made of 4 main parts, largely authomatised compared with prototype 1.
-
Mid term results
Indications for addressing updated normative protocols of waste treatment at national and cross-national scale. Indications about the industrial quality of combustion products and field of re-use.
Dissemination activity and networking with other LIFE projects beneficiaries, stakeholders, possible future industrial partners is carried out. The timing of the dissemination activity is tightly intersected with the technical development.
-
Long term results
As a long term feedback, decrease in landfilled waste is expected, and therefore a decreased need for waste dump and a better use of the territory.